|
VENSEL ENTERPRISES 1-800-662-6099 Catalog - Page 96 |
||||
![]() |
PRODUCTION
ARMATURE RESHAFTING TOOLING
• Order piece by piece • Hardened steel makes this tooling last through high production conditions • The design of this tooling will provide you with the lowest fall out ratio of any tooling available • Picture shows step by step shaft removal & installation • Four pieces are needed for removal • One additional piece is needed for installation in most applications • Must specify armature For Shaft Removal - the following pieces are needed Commutator vise = M155-0025-V, with application Reshafting sleeve = M155-0025-S, with application Adjustable base cup = M155-0025-C, with application Press plate = M155-0025-PP, with application Note: a different reshafting sleeve is needed for each armature application For Shaft Installation - the only additional tooling is Drive end shaft bushing = M155-0025-DSB, with application Adapter ring = M155-0025-A, only need for limited applications |
||||
![]() |
ROTOR
REBUILDING TOOLING
ROTOR RESHAFTING TOOLING A452-0001 + APPLICATION • Remove & install the shaft • Position the slip rings • Clamp the pole pieces in place • 5 piece set • Must specify application Press required: 20 Ton |
||||
![]() |
POLE
PIECE STAKING TOOLING
A452-0002 + APPLICATION • Stake the pole pieces tight against the rotor shafts • Insure a better contact between the pole piece and the center slug • 2 piece set • Must specify application Press required: 20 Ton |
||||
![]() |
POLE PIECE EXPANDER
TOOLING
A452-0003 + APPLICATION • Increase output & reduce cut in RPM • Spread out the rotor claws on a disassembled rotor to decrease the air gap between the rotor the the stator • Rotor pole pieces must be remachined after assembly • 2 piece set • Must specify application |
||||
|
VENSEL ENTERPRISES 1-800-662-6099 Catalog - Page 96 |